SITE PREP FOR NEW MRI BLDG.
Date
January 10, 2018Category
Commercial Construction, Renovation, Specialty Construction,DEPARTMENT OF VETERANS AFFAIRS, VA SIERRA PACIFIC NETWORK (VISN 21)
This specialty construction required RF and magnetic shielding for the entire expansion so that the MRI system’s resonance would not exit the structure. This included RF shield at all wall, ceilings, floors, and HVAC ducts/vents. Magnetic shielding was required at distinct walls.
As the General Contractor on the Bid-Build contract, Halbert Construction was required to frequently meet with the MRI design team to coordinate schedules, materials, and particular system requirements for construction.