TRAINING POOL

Date

November 15, 2016

Category

Commercial Construction, Renovation, Specialty Construction,

TRAINING POOL

A POOL AND DECK

Project Description

This is a design-build project which will replace the B-161 swimming pool and deck to provide physical readiness and recreation for Fleet personnel. The project is to demolish the existing 50×22.9 meter pool and deck, then construct a new pool and deck. The pool depth will be similar to the existing pool with depths varying from 1.22 meters to 3.7 meters.

The project includes the replacement of the majority of outdated and inefficient mechanical pool equipment, such as filters and pumps. The project will also construct a bathhouse support facility adjacent to the pool. The bathhouse will include menís and womenís toilets, showers and locker rooms serving the pool. The deteriorated perimeter fence will also be replaced with this project.

Details

Date July, 18th 2016
Location Colorado
Time 1.5 Years
Category Construction
Client Mechanical Pool